With the string line in place, I had a few days to rough in my below grade plumbing. My plan is to eventually tie into my existing septic tank and field. Fortunately, the inlet at the septic tank is down slope enough that I can rely on gravity and not an ejection pump. For a long time before we started the initial excavation work, I thought for sure that I would need an ejection pump. When I shot the elevation after excavation, I was surprised to find that it was just perfectly down slope of the house.
I had already installed a run of 4" ABS from within 4' of the septic tank inlet to a spot that I figured (after much fussing) would be directly below where the main floor toilet would be. The rough-in work was pretty easy since the top of the gravel pad was already 10" below where the sub-slab rigid foam would be. I only had to do a little scraping with a pick at the low end and I did have to dig a hole around the existing 4" drain to install a "wye" and a 45. The worst part was the mosquitoes in the evening. In addition to the plumbing, I installed a run of 3" ABS as an air supply for the woodstove.
| The drawing I submitted for my permit. |
After leveling, the footing forms were brought in. My contractor had 12" panels for the interior footings but the 18" panels for the exterior perimeter had to be built from scratch. I worked with his crew under the very hot sun pounding stakes, leveling and bracing forms, fitting and trimming rigid foam and laying rebar. With seven people (including myself) we finished everything in a little less than two eight hour days - this included lots of extra breaks to prevent heat stroke. The rigid foam was installed as per my drawing in "Planning for the foundation". The foam boards fit snugly in the forms and didn't require any special bracing or fastening to keep them in place for the pour. I pushed several 3 1/2" ardox nails into each foam board at odd angles so that they would stay in place on the concrete after the forms were stripped.
| Four courses of 15 millimeter rebar with stirrups 24" o.c. The vertical bars are also 15 mm and are what tie the basement (concrete) wall to the footings. Zoom in to see the ardox nails in the foam. |
Hi Lucas,
ReplyDeleteI'm curious. Why didn't you install the rigid foam insulation on the inner face of the outer form before pouring the footings? That would have bonded the foam to the footing as you did on the inside face. - Jim
Jim,
ReplyDeleteI had initially thought of doing it that way but there were complications. The biggest reason we did it this way was that we were able to stack the wall forms on top of the slab edge forms.
Lucas,
ReplyDeleteAfter you poured the concrete walls and stripped the forms, how did you attach the rigid foam to the concrete?
Stay tuned for the next episode ;-)