Excavation started in early June. For the walk-out basement the building site basically just needed a notch cut into the sloping terrain. When staking the site beforehand I was sure to include extra space for the horizontal insulation that surrounds the footing as part of the FPSF design. The horizontal insulation required an extra 4' all the way around and 6' at the corners (minimum). I added an extra 1' to those numbers so I'd have some "wiggle room". I had the machine operator slope the bottom of the excavation slightly downhill as well for better drainage. This proved well for me as it began raining as soon as we finished...
| A notch in the ground. |
After the excavation, it was time to build the gravel pad. Another requirement for good FPSF design is to build on top of "non frost-suseptible material" - basically a well drained layer of compacted gravel. I used screened "A" gravel that packed really well. The gravel was compacted in 6" lifts with a 1000lb diesel plate tamper to 100% SPDD. You can tell when you reach this point because the plate tamper literally starts bouncing off the gravel. Because of the way the excavation was sloped, final pad thickness was 12" at the high end and about 18" at the low end. For best possible drainage, I installed 4" weeping tile in the gravel which was run downhill and drained to daylight.
| The shallow end of the french drain. This whole area had to be dug up. Lots of spongy spots. |
Lucas,
ReplyDeleteIs there any concern that compacting the stone may crush the weeping tile? Did you test for this?
Jim
Hi Jim,
ReplyDeleteI didn't do any testing, but I was never really concerned about it. The plate tamper works by vibration so the compaction process is uniform through a thick layer of material. I don't think it would be a good idea to use a ramming-type compactor...
In any case, it rained plenty in June before the slab was put in. Water could be observed running out where the weeping tile drained into a swale for days after a good rain.